• 2016:Дата
  • KazTransOil JSC:Заказчик
  • «Water pumping station-5»:Объект

Technical description

Water supply increase to 150 000 m3 per day

Land area – 3,23 hа
Modernization of trunk pumping station
Old pumps replacement with the modern  brand  pumps RuhRPumpen
Services provided

  • Estimate section correction
  • Price lists compiling
  • Method Statement correction
  • Design documentation maintenance during Gosexpertise procedures  until appropriate positive conclusion obtained within fixed time period

Client`s advantages –  Design documentation quality improvement.

As a result unlisted expenses revealed.